airs-3855
Table of Contents
AIRS-3855 PO Split: Link between ORG and NEW SL
Actually
- Before the customer can accept new SL, he should accept ALL the old SLs first.
TODO
Spec
As a customer user, I do not want to be forced to accept ALL original SL of a line item before I accept one new SL. Instead of this, I would like to accept only the original SL which belongs to the new SL I want to accept.
⇒ Acceptance criteria:
- Customer user needs to accept only the original line which belongs to the new line before he can accept this new line.
Refined
- - Change
POCollabEngineEJB.getOriginalSplitLine()(add Filter for RSNum of the original line) - - Change the default error message for
airsupply.po.error.text.collab.split.actionnotpossible(seePOCollabEngineEJB.exceptIfOriginalSplitNotProcessed()) - - write a (integration?) test for
POCollabEngineEJB.getOriginalSplitLine()