User Tools

Site Tools


chalkup_checklist_departure_control

ChalkUp Checklist Departure Control

Subprojects

Spec

This is not really a specification, but it still can be helpful to implement the app.

Screens

The app consists of following screens:

  • questionnaires list screen
    • shows all questionnaires we have in a given category (e.g. “Done”/“Drafts”/“Trash”)
    • is available from drawer
  • templates screen
    • it shows all available templates
      • → in case of “Chalkup Checkliste Abfahrtkontrolle” it have only one (?) template
    • is available from drawer
  • settings screen
  • questionnaire details screen
    • shows the details of one given questionnaire
    • is available when the user clicks on a list entry in the “questionnaire list screen”
  • questionnaire report screen
    • shows PDF created from the given questionnaire

Data structures

Currently this is a “plan” (=a couple of thoughts), not a real implementation. But, sure, in the future it must be implemented in some way.

  • Questionnaire
    • usually a completed questionnaire or a draft of a completed questionnaire
    • this means it is not a template for a questionnaire (questions), but a data structure to save answers
  • QuestionnaireTemplate
    • contains a question list, which must be filled out by the user

Activities

At the moment only one activity exists:

  • MainJetpackComposeActivity
    • it starts with the app and it contains all “root” logic
    • it contains ChalkupDrawer
    • body of ChalkupDrawer contains AndroidViewBinding
    • AndroidViewBinding inflates ContentMainBinding (which is declared in content_main.xml)
    • content_main.xml has FrameLayout with only one FragmentContainerView
    • FragmentContainerView uses mobile_navigation
    • mobile_navigation uses as startDestination “@+id/nav_qlist”, so QlistFragment
    • QlistFragment loads done list as default

Misc

...TO BE CONTINUED...

…

TODO

  • - implement drawer
    • + add all necessary points
      • + Checklists
        • + Done
        • + Drafts
        • + Trash
      • + Templates
      • + Settings
      • + About
    • - implement all necessary fragments (with dummy data)
      • - Checklist details
      • - Checklists
        • - Done
        • - Drafts
        • - Trash
        • - Checklist Details
      • - Templates
        • - Templates List
        • - Template Details
      • - Settings
      • - About
    • - implement loading of this fragments with proper data
    • - implement PDF export

Time line / Schedule

  • I need estimated ca. 15 working days.
  • So if I start now (07.08.2024) and we will have 3 weeks vacations in August / September, then I will have something to show ca. at 01.11.2024.

Broken down by “working units”:

  • - implement all necessary fragments with dummy data (⇒ 8 days)
    • - Checklists (3,5 days)
      • - List of Checklists = QlistFragment (1,5 days)
        • - Done
        • - Drafts
        • - Trash
      • - Checklist Details (2 days)
    • - Templates (3 days)
      • - Templates List (1 day)
      • - Template Details (2 days)
    • - Settings (1 day)
    • - About (0,5 days)
  • - implement loading / saving proper data in all fragments (⇒ 4 days)
    • - List of Checklists = QlistFragment (⇒ 2 days)
    • - Checklist Details (⇒ 2 days)
  • - implement PDF export (⇒ 2days)

Misc

  • - Screen mit allen Checklisten
    • Notes:
      • die Checkliste basiert auf /home/kalaschnikow/Desktop/tmp/Checkliste-Abfahrtkontrolle-FleetGO.pdf
      • there are more checklists, which are “defined by law” in Germany
        • examples:
          • Erste-Hilfe-Kosten Checkliste
          • Abfahrtskontrolle PKW
          • Abfahrtskontrolle LKW - 218
          • Arbeitsauftrag - 505
          • Auto-Wartungscheckliste - 453
          • Checkliste Regalprüfung - 1214
          • Fahrzeugwartungsprotokoll - 1082
          • Gebäudewartung - 370
          • Gebäudezustand - 275
          • Kfz-Inspektion - 869
          • Prüfprotokoll Brandschutztüren(?) - 848
          • Rauchmelder - 374
          • Wartungsprotokoll für Rauchmelder - 524
          • Audit ISO 9001:2015 - 411
          • Audit Pflege - 342
          • Apothekeninspektionen - 354
          • Gefährdungsanalyse Legionellen - 214
          • ISO 13485 Audit - 678
          • … ⇒ find the source of above list
            • DGUV ?
      • - andere Checklisten finden, die man auch kostenlos anbieten kann
        • - Facility Management / Gebäudereinigung
        • - Ambulante Pflege
        • - …
chalkup_checklist_departure_control.txt · Last modified: by kalaschnikow